Publications

Independent reporters

14 January 2014
Body
Independent reporters provide professional advice to the ORR on the quality of Network Rail's service provision, as specified in its licence.

Portsmouth resignalling documentation

14 January 2014
Body
On 30 July 2007, we imposed a penalty of £2.4m for Network Rail's breach of its licence in failing adequately to evaluate and mitigate the risks associated with the Portsmouth resignalling project and to manage its contractor in line with best practice. The documents below provide more background to our decision. Portsmouth Resignalling - enforcement - letter to NR 6 Sep 2007 Portsmouth

Infrastructure capability documentation

14 January 2014
Body
On 2 March 2006, we imposed a fine of £250,000 on Network Rail for its failure to ensure the information it made available to the industry on the capability of its infrastructure was accurate. Infrastructure Capability - letter to NR regarding completion of final milestones in the recovery plan PDF icon PDF, 103 Kb 10 Jan 2008 Infrastructure Capability - Breach of Network Licence - Letter from

Overruns documentation

14 January 2014
Body
On 13 May 2008, we imposed a penalty of £14m on Network Rail because of systemic weaknesses in Network Rail's planning and execution of engineering work which represented a serious and continuing breach of its licence. These problems were exposed in our investigation into the overruns into the New Year. Improving project delivery - 2010 Audits - ORR letter to Network Rail 15 Jul 2010 Improving

Periodic review 2008

14 January 2014
Body
The 2008 Periodic Review (PR08) set the outputs that Network Rail must deliver, and the level of access charges paid by train operators for use of the infrastructure from 1 April 2009 to 31 March 2014, or control period 4 (CP4).

Our decisions for 2014-2019

14 January 2014
Body
The decisions we've made will help the railway to grow in a sustainable way which minimises the costs to taxpayers, passengers and freight customers.