Rail Operations Group Ltd
I/KPD1/04/2020
The notice was served as Rail Operations Group Ltd have failed to provide such information, instruction and training, to ensure, so far as is reasonably practicable, that employees are in a position to plan, prepare and operate locomotive-hauled trains compromising of un-braked vehicles, such that their employees and persons not in their employment are not exposed to risks to their safety.28 April 202028 July 2020 
Bodmin and Wenford Railway PLC
I/20200317/ABC/01
The notice was served as Bodmin and Wenford Railway PLC have not made a suitable and sufficient assessment of the risk created to the health of their employees at work, in the woodworking workshop and of the steps that need to be taken, to meet the requirements of the Control of Substances Hazardous to Health Regulations 2002, as amended.18 March 202030 September 2020 
Keolis Amey Operations / Gweithrediadau Keolis Amey Limited

I/RJB04032020CMS
This notice was served as Keolis Amey Operations / Gweithrediadau Keolis Amey Limited were unable to demonstrate they have given effect to arrangements, as are appropriate for the effective control and review measures, in relation to the competence and fitness management of conductors. There is no suitable task based risk assessment for the role of conductor and the competence development procedure is insufficient for managing poor performance.05 March 202030 September 2020 
Keolis Amey Operations / Gweithrediadau Keolis Amey Limited

I/RJB04032020TDRA
This notice was served as Keolis Amey Operations / Gweithrediadau Keolis Amey Limited have failed to make suitable and sufficient Train Dispatch Risk Assessments (TDRAs) of the platforms in operational use at the unmanned stations that they manage and operate, for the purpose of identifying and implementing measures needed to ensure the safe operation of trains at these stations.05 March 202030 November 2020 
West Midland Trains Limited

I/BS050320/01
This notice was served as West Midland Trains Limited have failed to ensure, so far as is reasonably practicable, the safety of employees and non-employees (others with cause to be on site who are not in their employment) when boarding and alighting from trains at the North end ‘stop and await’ boards on Roads 13, 14 and 15.05 March 202014 May 2020Complied
Amey Rail Ltd

I/MM240220
This notice was served as Amey Rail Ltd have not ensured, so far as is reasonably practical, that construction work is carried out without risks to safety. Specifically, the system for planning work on or near 25kV AC line electrification equipment allows work activities which have not been thoroughly reviewed by a competent person to be carried out. As a result employees, or others, may work on or near live equipment.24 February 202021 March 2020Complied
GB Railfreight Ltd

I/KPD1/01/2020                    
This notice was served as Amey Rail Ltd have not ensured, so far as is reasonably practical, that construction work is carried out without risks to safety. Specifically, the system for planning work on or near 25kV AC line electrification equipment allows work activities which have not been thoroughly reviewed by a competent person to be carried out. As a result employees, or others, may work on or near live equipment. 29 January 2020       01 May 2020Complied