Periodic review 2018 (PR18) consultations

A list of our PR18 consultations in date order.

Changes to charges and contractual incentives - Consultations
Closing date: 30 Nov 2017
This consultation seeks views on a series of proposals to change the charges and contractual incentives regimes for control period 6.


Consultation on the overall framework for regulating Network Rail
Closing date: 21 Sep 2017
We are consulting on how we propose to regulate Network Rail in CP6.


System operation in control period 6 (CP6)
Closing date: 21 Sep 2017
As well as setting out some decisions we have made on elements of the regulatory framework for the Network Rail national system operator, this consultation seeks views on further aspects of the national system operator (NSO) settlement.


Consultation on improving Network Rail’s renewals efficiency
Closing date: 13 Sep 2017
This consultation document seeks views on what Network Rail, ORR and the wider industry need to do differently to improve renewals efficiency in CP6.


Consultation on the financial framework for PR18
Closing date: 13 Apr 2017
Our first consultation on the 2018 periodic review (PR18) financial framework sets out key issues for PR18 relevant to the determination of Network Rail’s revenue for control period 6 (CP6 - 1 April 2019 to 31 March 2024) and seeks views from stakeholders.


Guidance on Network Rail’s strategic business plans
Closing date: 11 Jan 2017
This consultation seeks views on our draft guidance to Network Rail on its strategic business plans for control period 6 (CP6).


Periodic review 2018 (PR18) initial consultation and conclusions
Closing date: 10 Aug 2016
This was our first major consultation on the 2018 periodic review (PR18). This consultation is now closed.


Network Charges - a consultation on how charges can improve efficiency
Closing date: 4 Mar 2016
This consultation looked at the way in which Network Rail charges train operators for use of its network. This consultation is now closed.


Preparatory work for the review of Schedules 4 and 8
Closing date: 15 Jan 2016
We are preparing for reviews Schedules 8 and 4 of the track access contract (the performance and possessions regimes, respectively) for the 2018 periodic review of Network Rail (PR18). This consultation is now closed.