ORR’s proposed approach to track access and the future operation of High Speed 2 (HS2)

The purpose of this page is to set out how ORR proposes to take into account the future operation of HS2 when making decisions about access to the existing network.

HS2 track access documentation

Consultation on ORR's proposed approach to track access and the future operation of High Speed 2 (HS2)
The purpose of this consultation is to seek views on how ORR proposes to take into account the future operation of HS2 when making decisions about access to the existing network.
21 September 2017

Letter from the Department for Transport on HS2 track access issues
8 September 2017
Note: the wording of Annex 1 of the DfT letter was amended on 25 September 2017. For fuller detail regarding the assumed train service patterns set out in that Annex, please refer to pages 61-64 of HS2 Phase Two PFM v7.1 Assumptions report.